Not just a home, a Flawless and Serene Community where Tranquility resides
Overview
YR Elite is located at Chithanapalli Hosur, spread across 8.5 acres of land and can accomodate 120+ Villas with multiple dimensions & latest amenities.
Located about 25 kms from Electronics City, The layout is in the most lucrative destination and is next to I T Park, Hosur Bagalur Road, near to Hosur Corporation "Office".
One more advantage is that Hosur is very well connected to Bangalore, Chennai & Andhra Pradesh via NH-207 which is very helpful for people from different states to travel comfortably.
The most development aspect of Hosur is that it is fully filled with Industrial Units from sectors like abrasives, automobiles, bakery to wielding and wire mesh industries. TVS Motor Company and Ashok Leyland are famous Indian automobile companies which have their manufacturing units in Hosur.
Location Highlights
100ft from Sidharth Village School & Brundavana School
1 km IT park
1 km Hosur Corporations Office
5 km Hosur Bus Stand
500 meters Police Station
1 km RTO Office
1 km Chaitanya School
Near by Super Market
Near by Hospitals
Sarjapura just 15 km from our project
Amenities
Entrance Arch
Gated Community
24 hrs security with CCTV
Tar Road
Children Play Area
Overhead Tank
Pricing
PREMIUM 3 BHK VILLA PRICE BREAKUP
Villa Size
Land Cost
Builtup Cost
Approval Cost
EB Deposit
Total
1032 sft.
1032 x 4500 per sq.ft = 46,44,000
1400 x 2700 per sq.ft = 37,80,000
1,55,000
35,000
Rs. 86,14,000
1162 sq.ft.
1162 x 4500 per sq.ft. = 52,29,000
1600 x 2700 per sq.ft. = 43,20,000
1,70,000
35,000
Rs. 97,54,000
1200 sq.ft.
1200 x 4500 per sq.ft. = 54,00,000
1600 x 2700 per sq.ft. = 43,20,000
1,70,000
35,000
Rs. 99,25,000
REGISTRATION CHARGES ARE ADDITIONAL
KEY FEATURES INCLUDED:
- False Ceiling for Living area and Bedrooms
- Jaquar and Parryware Bath Fittings
- Wall mounted Western Closet
- Granite Staircase with Glass Railing
- Semi Wood Work
- 5000 litres Sump
- 5000 litres Septic Tank
Payment Details
Booking Amount of Rs. 1,00,000 (Day 1)
Notes
Extra Construction cost Rs. 1700/sqft
5% premium for all North Face Villas
10% premium for all South East Corner Villas
15% premium for all North East Corner Villas
Registration, Stamp duty, Vat, service tax & Building Plan Approval extra
Advance maintenance for 2 years Rs.2.00 per sqft per month on built up area
Wire Transfer
Account Name :
BalaSubramani
Account Number :
9200 2003 3285 055
Account Type :
Current Account
Bank Name :
AXIS BANK
Branch Name :
Hosur
RTGS/NEFT/IFSC Code
UTIB0000535
Reference Mobile :
94898 53555
SPECIFICATIONS:
Earthwork excavation for foundation in all soils and sub soils and to the required depth.
PCC 1:5:10 using 40mm jelly including cost of ramming curing etc all complete 4" tk.
RCC 1:2:4 using 20mm jelly required thick for footing.
Steel required size of column, footing & matt.
Flooring 1:5:10 using 40mm jelly and thick of 3" tk.
Brick work in cm 1:6 230mm tk wall up to lintel level.
For column 230x230mm wherever required.
Lintel cut lintel 4" in 1:2:4 using 20mm jelly.
Lintel 8mm dia rod 4 numbers 8mm dia for rings necessary spacing.
Above lintel concrete brick work in cm 1:6, up to roof level.
From the floor level to roof brick work height 9 ¼ - feet.
RCC roof 1:2:4, using 20mm tk with sheet centering.
Roof slab thickness 5" tk depending upon the tk will differ.
Wherever required the beam in the roof slab may be provided & suitable rod design.
Roof top parapet wall 2’6"height.
Top of the roof cm 1; 3 flooring may be provided.
Necessary point’s rain water pipe will be provided.
Plastering in cm 1:4 -12 mm tk for inner and outer.
MAIN DOOR :
Frame : 5"x4" - Teak Wood
Shutter: 1"tk - Teak Wood
Door Look
Handle - inner & outer
Tower bolt - inside 2 nos
Hinges - 5"height - 4nos
Finishing all and good quality polish work for main door only.
Safety Steel Door
BEDROOM :
Inner side Bed Room Door 4"x3" tk frame
Frame: UPVC
Shutter: Water Proof Pressing Door
Handle, Lock, Tower Bolt will be provided
Window frame UPVC 4"x4" shutter UPVC with steel grills
Bath Room PVC Doors
Hall - 4’x6’-1, 4’x6’-1, bed-4’x4’-1,
kitchen-3’x3’-1, bath room - 2’x11/2’ windows will be provided. If extra
windows, payment will be extra.
Kitchen Bed 40mm tk Granite Slab
From the kitchen bed above 2 side wall tile will be provide tile extra cost max 75sq.ft.
BATHROOM :
Wall up to lintel level tile will be provided tile extra cost
Flooring Anti skid tile will be provided tile extra cost.
HALL, BEDROOM, KITCHEN :
Flooring verified tile will be provided tile extra cost
All-round skirting 4" tk will be provide in the verified tiles.
PORTICO :
FLOORING :
Eurocent tiles will be provided at extra cost
Wall-front & Adjunct: 2 walls up to roof height at extra cost tile will be provided.
PAINTING :
OUTER SIDE:
One Coat - Primer
Two Coat - Color Paint ACE
INNER SIDE:
One Coat - Putty
One Coat - Primer
Two Coat - Color Paint Ace
DOOR WINDOW :
One coat putty, one coat primer, 2 coat enamel paint
During the construction any expansion, the differences of cost has to pay the building owner.
Inner 1’6"-loft-Bedrooms, Kitchen-One side Cuddapah: cupboard-Bed room, Kitchen-One side
will be slab provided-4 width 4’x1’-size.
If any extra wood works, extra cost is charged.
COMPOUND WALL :
All Round 4 feet height in Hollow Block work is cm1:4, 4 ¼ "the wall and 2 sides plastering
and 1 coat white washing (white cem).
Gate maximum - 120 kg’s weight will be provided.
All round the building PCC 1:5:10 using 40mm jelly & plastering the flooring - 4’’
tk concrete & plastering - (Extra).
Sump 5000 litre covered in this rate
ELECTRICAL :
ISI make wires 1.5 sq.mm and ISI make switches like (vguard,finolex)
Wherever required 2.5, 4.sq.mm wire will be provide(like geyser,15amps)
Branded pipe like (supreme, finolex ) PVC water line pipes to be use
Taps extra cost
Bath room = one tap hot water cold water pipe line only provided
Toilet basin - extra cost one tap will be providing
EWC one toilet extra cost
Kitchen 2x2 cudappah sink / fiber one tap point will be provided
The sqft rates are inclusive of portico, steps, and sunshades
Staircase handrails steel hand rails will be provided -130 kg front elevation
One common toilet, one attached toilet will be provided
In case extra toilet, extra cost will be applicable
Elevation design cost will be extra
Laundry stone & steel angle will be provided
ELECTRICAL :
5 amps plug point - 1800 / point
15 amps plug point - 4000 / point
Grill work like handrail gate - Rs 75/kg ornamental works like flowers-extra
Front elevation extra charges depending upon the work
Extra pipe line or any tap point-5000/point
If required EB - 20000 / each
E.B Deposit Extra: The work has to complete as per the drawing and above said specification.
During the construction any changes apart from drawing or any correction, rectification work,
demolishing, alteration charges (material + lab our) pay by the building owner.
(Note: While completing the building at the time of handover to the
owner by the Contractor, The entire balance amount shall pay without any balance. After the entire
balance is paid to the contractor, then only the painting, Doors and Shelters shall be finished by
the contractor.)
30 x 40 (East Facing)
3 BHK Duplex Type (A)
Built Up Area - 1713 sft
30 x 40 (East Facing)
3 BHK Duplex Type (B)
Built Up Area - 1518 sft
30 x 40 (West Facing)
3 BHK Duplex Type (C)
Built Up Area - 1774 sft
30 x 40 (West Facing)
3 BHK Duplex Type (D)
Built Up Area - 1516 sft
30 x 50 (East Facing)
3 BHK Duplex Type (E)
Built Up Area - 2341 sft
30 x 40 (East Facing)
2 BHK Type (F)
Built Up Area - 913 sft
30 x 40 (West Facing)
2 BHK Type (G)
Built Up Area - 923 sft