Branded pipe like (supreme, finolex ) PVC water line pipes to be use
Taps extra cost
Bath room = one tap hot water cold water pipe line only provided
Toilet basin - extra cost one tap will be providing
EWC one toilet extra cost
Kitchen 2x2 cudappah sink / fiber one tap point will be provided
The sqft rates are inclusive of portico, steps, and sunshades
Staircase handrails steel hand rails will be provided -130 kg front elevation
One common toilet, one attached toilet will be provided
In case extra toilet, extra cost will be applicable
Elevation design cost will be extra
Laundry stone & steel angle will be provided
ELECTRICAL :
5 amps plug point – 1800 / point
15 amps plug point – 4000 / point
Grill work like handrail gate – Rs 75/kg ornamental works like flowers-extra
Front elevation extra charges depending upon the work
Extra pipe line or any tap point-5000/point
If required EB - 20000 / each
E.B Deposit Extra: The work has to complete as per the drawing and above said specification. During the construction any changes apart from drawing or any correction, rectification work, demolishing, alteration charges (material + lab our) pay by the building owner.